PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

1) Formwork for Foundation Wall at Col Line 2.5.JPG 3) Slip Form Prep.JPG 2) Insulation at Elevators 5 - 6 awaiting slip forms (2).JPG 5) Ice on Site at Footing H1 (2).JPG 4) Formwork for Foundation Wall at Col Line 2.5 (2).JPG
Previous page 4) Formwork for Foundation Wall at Col Line 2.5 (2)
4) Formwork for Foundation Wall at Col Line 2.5 (2)